Sign the public
petition.
Ask the Village Board to defer final action on the Campus Drive rezoning. Read and sign the petition on Change.org.
Sign on Change.orgCAMPUS DRIVE REZONING · FALL 2026
Lennar proposes 102 townhomes on 20.5 acres. The environmental review has changed, but the Board still has to decide whether to change the zoning map. Demand clear answers on traffic, construction, and water before that decision.
The public petition is on Change.org. Read it, sign, and share.
Add your voice to the public Change.org petition, then share it with your neighbors.
THE ACTION CENTER
Read the record. Contact your representatives. Bring your questions into the room.
Ask the Village Board to defer final action on the Campus Drive rezoning. Read and sign the petition on Change.org.
Sign on Change.orgAsk for independent engineering analysis and a NO vote until outstanding questions are resolved.
Open the email action centerPlan for the Board meeting at Village Hall. Check the official agenda for hearing and Zoom details.
Meeting informationMake neighborhood support visible. Download the artwork or send a request for a free lawn sign.
Request a free lawn signSEPTEMBER 14 · WHAT CHANGED
The campaign reports a 4–1 vote on September 14 to proceed under a SEQRA exemption. Our focus now is the zoning decision and the record supporting it.
Campaign meeting account; adopted minutes and the roll-call record are pending verification. Check the meeting archive.
Our meeting account describes unresolved commitments to Foxwood and qualified promises about tree preservation. We want binding terms residents can read and enforce.
Attendees reported a packed room, more than 100 Zoom participants, roughly two hours of presentations, and 30 minutes of comment. We are asking for enough time to address the substance.
The applicant’s August memorandum claims an exemption. An EAF is one part of the submissions; the Board should explain how all studies, public comments, and independent reviews inform its decision.
Read the applicant’s exemption position →Regional context: HGAR reports that Mount Pleasant is considering stronger wetland, slope, and tree protections. Those proposals are not described as adopted law.
THE EAF EVIDENCE HUB
Follow the filings, examine the assumptions, and ask for independent analysis before the zoning map changes.
Agency links are reference sources, not endorsements. Estimates and unresolved claims are identified below.
The proposed route takes 8 Carey Court from the RRR residential district to Campus Office, then brings the assembled site into a Planned Unit Development district. The campaign opposes this two-step approach and asks the Board to explain its compatibility with the Village’s planning goals.
The August memorandum lists 144,000 and 24,000 square feet of office space, 429 parking spaces, and a house. Those are applicant-reported figures, not an independent survey.
Publish a parcel-by-parcel explanation of the rezoning, the demolition plan, and enforceable protections for neighboring properties.
Read: August 5 technical memorandum, pp. 2–3 · Draft zoning amendment
The campaign questions the original EAF’s treatment of excavation under D.2.a. Before rezoning, residents deserve a clear account of rock removal, demolition, and work near the Catskill Aqueduct.
How much rock would be removed? Would blasting be used? What dust controls, asbestos surveys and abatement, vibration monitoring, and aqueduct protections would apply?
DEC’s land-impact workbook considers steep slopes and shallow bedrock. USDA soil reports can inform erosion review. A site-specific report is needed to substantiate the campaign’s cited CsD and ChE erosion ratings.
Independent engineering review, a construction sequence, and a published determination of applicable permits and disturbance limits. A checkbox does not remove other permit obligations.
Reference: NYS DEC land-impact workbook · USDA Web Soil Survey · DEC construction stormwater permits
Residents need measured current conditions alongside any comparison with a fully reoccupied office campus. The latest applicant memorandum describes the second office building as occupied; a zero-traffic baseline for the entire site is not supported by that document.
Using the brief’s 6,651-vehicle daily road volume gives 13.5% (895 ÷ 6,651), rounded to one decimal. These inputs need a dated source, route assignment, and a check for double-counting deliveries. This is not a verified net increase.
The brief’s 8% peak-hour assumption gives approximately 532 vehicles per hour, or a 6.8-second average interval. An average interval does not establish safe gaps or intersection capacity.
Continuous 24-hour counts over seven representative days, including Broadway/Bedford Road, with turning movements, school travel, deliveries, and pedestrian crossings. Explain the representativeness of the reported May 9, 2025 Friday count.
Compare: Applicant traffic comparison, p. 25 · NYS DOT station 870403 · Official traffic-study filings
The campaign brief cites 226 Bedford Road crashes and 165 Manville Road crashes: 391 of a cited 1,947 Village total, or approximately 20.1%. A dated crash-data export, geographic filters, and deduplication of intersection crashes are needed before treating this as a verified corridor statistic.
The campaign’s 895 daily-trip scenario equates to 6,265 trips per week. That estimate is not a count of vehicles crossing a particular sidewalk. The Board should examine the Campus Drive exit, Bedford Road crossings toward Chappaqua, and the Old Town Light intersection.
A corridor safety review covering crash severity, sight distance, turning conflicts, walking routes, and safe access for people of all ages.
Explore: Westchester County crash dashboard · NYS DOT traffic dashboard
The campaign asks for independent review of Pond 1P, the cited 31,577-cubic-foot storage figure, and drainage toward Foxwood. Storage volume is not a discharge rate; the review should show storm-by-storm flows, downstream capacity, easements, and maintenance obligations.
The applicant projects 33,660 gallons per day using 306 bedrooms at 110 gallons each. This is a design estimate. Residents need peak-hour capacity findings and clarification of the original EAF capacity answers reported as “TBD.”
Publish independent hydraulic checks and the applicable stormwater standards. Identify who owns, maintains, and pays for each system before the Board votes.
Read: Applicant demand calculation, Table 26 · Village SWPPP and hydraulic-loading filings · NYS Stormwater Design Manual · DEC wastewater design standards
Use the latest revisions. The Village’s project page contains submissions from multiple dates; earlier EAF answers may have been supplemented.
THE PUBLIC CHANGE.ORG PETITION
The petition by Amanda Chandler and Erin Fleming requests deferral of final consideration and any vote until after the 2026 Village election and the seating of the Trustees elected in that election.
It concerns the proposed zoning amendment for 1 & 3 Campus Drive and 8 Carey Court. The petition states that it does not ask the Board to prejudge the application’s merits.
This public online petition is separate from the paper protest petition, which has specific eligibility requirements.
Petition text supplied by the organizers. View the petition on Change.org.
To the Mayor and Board of Trustees of the Village of Pleasantville:
We, Amanda Chandler and Erin Fleming and the undersigned residents of the Village of Pleasantville, respectfully petition the Village Board of Trustees to defer final consideration and any vote on the proposed zoning amendment associated with the development of 1 & 3 Campus Drive and 8 Carey Court until after the 2026 Village election and the seating of the Trustees elected in that election.
The proposed rezoning represents a significant and lasting land-use decision for Pleasantville. It has generated substantial public participation and discussion concerning development, traffic, infrastructure, schools, environmental considerations, municipal services, and the future character of the Village.
With a Village election approaching and two seats on the five-member Board reaching the end of their current terms in 2026, we believe the public interest would be served by allowing the electoral process to occur before the Village takes final legislative action on this consequential rezoning request.
This petition does not ask the Board to prejudge the merits of the application. It asks only that final legislative action be deferred so that Pleasantville voters may participate in the upcoming election before an irreversible zoning decision is made.
We affirm that we are residents of the Village of Pleasantville and that entering my name below constitutes my signature in support of this petition.
The signature statement above is part of the quoted petition. Reading this page or using the campaign contact form does not sign it; signatures are collected on Change.org.
CONTACT THE BOARD
Your representatives should hear from you before they change the zoning map.
The draft addresses the Mayor and all four Trustees listed in the Village directory, with a copy to the Clerk for the public record.
Official Board contact directory →
Village Hall: (914) 769-1900
Written comments:
info@pleasantville-ny.gov
Opens your email app. Review the recipients and add your name before sending. Comments sent to the Village may become public records.
MAKE TIME TO PARTICIPATE
80 Wheeler Avenue, Pleasantville, NY · Regular meeting listed for 8:00 PM; work session listed for 7:00 PM.
The campaign is organizing toward October 26. The rezoning hearing and any vote date need confirmation in the Village’s formal notice. Use the agenda for remote participation and public-comment instructions.
THE RESOURCE LIBRARY
Campaign materials and public documents, together in one place.
STAY INVOLVED
Get campaign updates or request a lawn sign. We’ll use your details to respond to your request.